Training Content
Pre-learning Content
- Wireless product hardware installation (video)
- The wireless product introduction
- The installation of DBS3900
- The installation of BTS3900
- The key process
- The antenna and feeder system installation and cable terminal production (video)
- The pre-installation of antenna
- The installation of TMA
- The installation of a jumper with AISG cable
- The GPS antenna assembly and connection
- The grounding OT terminal assembly and connection
- Manufacture and installation of the BBU cable (including power cable)
- The production of OT terminals
- The Cold-pressed terminal production
- The production of SMB terminal
- The production of Ethernet cable terminal
- The jumper terminal production
- Overview of wireless equipment (e-courseware)
- The introduction of wireless network
- The wireless base station equipment introduction
- The wireless antenna products introduction
- Wireless equipment hardware installation (e-courseware)
- The introduction of equipment installation scene
- The introduction of wireless product installation steps
- The preparatory work for key quality points
- The installation of cabinet key quality points
- The BBU installation quality of key points
- The RRU installation quality of key points
- The RFU installation quality of key points
- The antenna installation quality of key points
- The GPS installation quality of key points
- The label installation quality of key points
- The power on inspection and closeout work key point
- Wireless site delivery and tool documentation application (e-courseware)
- The wireless delivery engineering business flow introduction
- The project starting and plans introduction
- The implementation of the project introduction
- The introduction of the project closeout
- The site drawings introduction
- The cable connection drawing introduction
- The introduction of construction drawing
- The introduction of BOQ
- The bill of material introduction
- The introduction of MR
- The introduction of DN
- The introduction of SOP (including iSOP)
- The QC Engineering Plan introduction (including Smart QC)
- The introduction of Checklist quality inspection
- The approval document introduction
- Survey and design process and site survey key points (e-courseware)
- An overview of the survey and design
- The survey and design steps
- The key point of the survey
- Survey tools and IT system applications (e-courseware)
- The survey tool introduction
- The introduction of IT survey system
- ISDP tool application(video)
- The ISDP Mobile APP tool application (focus site sign and completion acceptance)
- Engineering practice EHS Management (e-courseware)
- The concept and scope of EHS
- The introduction of PPE
- The climbing EHS
- The electrified operation EHS
- The on-site operation EHS
Pre-learning Duration:2 Weeks (Typical)
ILT Training Content
- Overview of wireless equipment
- The introduction of wireless network
- The wireless base station equipment introduction
- The wireless antenna products introduction
- Wireless equipment hardware installation
- The introduction of equipment installation scene
- The introduction of wireless product installation steps
- The preparatory work for key quality points
- The installation of cabinet key quality points
- The BBU installation quality of key points
- The RRU installation quality of key points
- The RFU installation quality of key points
- The antenna installation quality of key points
- The GPS installation quality of key points
- The label installation quality of key points
- The power on inspection and closeout work key point
- Wireless site delivery and tool documentation application
- The wireless delivery engineering business flow introduction
- The project starting and plans introduction
- The implementation of the project introduction
- The introduction of the project closeout
- The site drawings introduction
- The cable connection drawing introduction
- The introduction of construction drawing
- The introduction of BOQ
- The bill of material introduction
- The introduction of MR
- The introduction of DN
- The introduction of SOP (including iSOP)
- The QC Engineering Plan introduction (including Smart QC)
- The introduction of Checklist quality inspection
- The approval document introduction
- Survey and design process and site survey key points
- An overview of the survey and design
- The survey and design steps
- The key point of the survey
- Survey tools and IT system applications
- The survey tool introduction
- The introduction of IT survey system
- ISDP tool application
- The ISDP Mobile APP tool application (focus site sign and completion acceptance)
- Engineering practice EHS Management
- The concept and scope of EHS
- The introduction of PPE
- The climbing EHS
- The electrified operation EHS
- The site operation EHS
ILT Training Duration:1 Working Day
Hands-on Content
- EHS operation Hands-on 1H
- Cable terminal production 2H
- Power connector production
- Jumper connector production
- Ethernet cable connector production
- GPS cable connector production
- Outdoor connector waterproof
- Wireless (DBS + pole site) Hardware Installation Hands-on-Demo part (9H)
- Preparation before entering the station
- Preparation before installation
- Cabinet installation
- Cabinet equipment installation
- Antenna installation
- RRU installation
- GPS installation
- Cable laying
- Label production and paste
- Hardware installation quality self-test
- Equipment removal
- Wireless (DBS + pole site) Hardware Installation Hands-on-Job Shadowing part (student Hands-on practice, mentor guide)
- The content is same with Demo part
- Wireless (DBS + pole site) Hardware Installation Hands-on-Solo part (student solo Hands-on)
- The content is same with Demo part